Airport Vinnytsia

 

Project overview

Project description                                                                                          

International airport “Vinnytsia” (Havryshivka village).
The municipal project, the whole integral property complex – 100% ownership of the territorial community of the city. Located in the center of Ukraine, 7.5 km east from the Vinnytsia railway station, has a runway 2500×42 m with solid coverage and able to serve the the index 6 (six) aircrafts and below (A320, B737, TU-154, Yak-42, SAAB-340 and others) in communication between airports of Ukraine, Europe and the Middle East.

Project goals

  • Conformity to modern ICAO requirements (physical parameters of the runway);
  • Modern light signaling system and engineering equipment (ILS);
  • Modern emergency rescue station;
  • Tourism development and local economic development.

Investment needs

Amount and type

31,4 million euros.
The term of the
project
implementation
36 months.

Payback period

From 9 years.
Expected readiness
of the project
documentation
December 2018.

Location and infrastructure

Location

Gavryshivka, Vinnytsia district.

Infrastructure

 

 

 

Runway:
  • length – 2 500 м;
  • width – 42 м (extension up to 45 meters).
RD-3 runway and perron with the possibility of self-directing on 8 C-class aircraft, or 5 class C and Class D vehicles.
Passenger terminal with a capacity up to 400 passengers per hour (additional investment project for the reconstruction of the terminal complex is possible).

 

Click to see more about the airport terminal reconstruction

Click to see more about runway reconstruction